Industrial dehumidifiers for drying

Industrial and commercial dehumidification

Condair offers a comprehensive range of both desiccant and condensing dehumidifiers. This allows the most appropriate solution to be provided for a client's project, without any technology bias.

Systems are highly configurable with additional cooling modules, heat recovery and external condensers. Alongside this superior technology, Condair offers expert guidance on product selection and sizing with extensive application knowledge.

Dehumidifier categories

Select a category or use the filter options below to create a shortlist of industrial dehumidifiers that are most suitable for your project.

Dehumidifiers

Condair DC

Condensation-Dehumidifier
The Condair DC floor-standing dehumidifiers are designed for industrial, commercial and pool environments. Flexible duct connection options and a robust design provide efficient recirculation dehumidification and reliable performance, ensuring optimal humidity control even at lower ambient temperatures.
read more

Condair DC-C

Condensing-Dehumidifier
The Condair DC-C series ceiling-mounted dehumidifiers are designed for industrial, commercial and pool environments with limited installation space. Their compact design enables efficient recirculation dehumidification and quiet, reliable performance, ensuring optimal humidity control even at lower ambient temperatures.
read more

Condair DC-W/R

Condensing-Dehumidifier
Wall-mounted condensing dehumidifiers for commercial, industrial and pool applications, available as the elegant DC-W for direct room installation or the discreet DC-R for mounting in an adjacent room. Both provide efficient humidity control and reliable operation, even at lower ambient temperatures.
read more
Condair DA 160 - 440 Desiccant-Dryer

Condair DA 160 - 440

Desiccant-dryer
Compact and portable adsorption dehumidifiers in a durable stainless steel housing. Suitable for smaller spaces, such as laboratories, basements, archives and for construction drying.
read more
Condair DA 210 - 450 desiccant dehumidifier

Condair DA 210 - 450

Desiccant-dryer
The Condair DA 210–450 series are compact, robust desiccant dehumidifiers with high-performance silica gel rotors, designed for reliable and efficient dehumidification in demanding industrial, commercial applications, including storage, archive and production areas.
read more
Condair DA Desiccant Dehumidifier

Condair DA 500 - 4000 dehumidifier

Desiccant-dryer
Condair DA 500–4000 desiccant dryers deliver precise humidity control down to 10 % RH or lower and operate reliably across a wide temperature range. Their robust insulated housing, well-thought-out construction, and advanced controls ensure reliable and energy-efficient performance in demanding industrial environments.
read more
Condair DA 4400 - 12000 desiccant dehumidifier

Condair DA 4400 - 12000 dehumidifier

Desiccant-dryer
The Condair DA 4400–12000 desiccant dryers provide powerful dehumidification down to 10 % RH or lower and ensure reliable, effective performance even at low temperatures. Their robust, insulated housing and advanced control system ensure precise and energy-efficient operation in demanding large-scale industrial environments.
read more
Condair DA 13000-27000 adsorption dryer

Condair DA 13000 - 27000

Desiccant-dryer
Large-capacity desiccant dryers for high airflows and moisture loads. Individually configurable for each application, the Condair DA 13000–27000 series allows flexible use of different thermal energy sources for regeneration and can be factory-equipped with pre- and post-cooling coils as well as custom filter classes.
read more
Condair DA Freezer desiccant dehumidifier

Condair DA Freezer

Desiccant-dryer
The Condair DA Freezer series delivers reliable, efficient dehumidification for deep-freeze storage and test chambers. With heavily insulated stainless steel housing and optimised components, it prevents ice formation, preserves operational space, and ensures safe, continuous performance in extreme low-temperature environments.
read more
Drying, Dehumidifiers & Dehumidification
Guide to industrial dehumidifier selection

Get a free 10-point guide to dehumidifier specification

Download your 10-point guide to specifying dehumidifiers and get an easy-to-follow overview for planning dehumidification projects.

It covers system design, dehumidifier selection & sizing, drying psychrometrics, energy saving and much more.

Get in touch with us

Contact us

Need humidity control guidance? Get in touch with a Condair expert.

Find a Condair representative in your country

Find your nearest regional Condair representative from our global network of experts.